How soon one should walk on newly laid floor tile is generally 24hrs or so. This is assuming normal amounts of adhesive was used under them and good conditions.
Drying time on many adhesives will be affected by temperature or moisture conditions. And one wouldn't apply adhesive over a surface that exceeds moisture emissions listed on the package.
Walking on newly laid tile prior to dying may cause them to slip out of alignment with the other tiles or cause breakage.
Drying time on many adhesives will be affected by temperature or moisture conditions. And one wouldn't apply adhesive over a surface that exceeds moisture emissions listed on the package.
Walking on newly laid tile prior to dying may cause them to slip out of alignment with the other tiles or cause breakage.